Que Vo III (Available 100/303ha)

QUE VO III INDUSTRIAL PARK – INTRODUCTION

Que Vo III Industrial Park, a multi-sector industrial zone, situated in Bac Ninh province, a center of North Key Economics Zone, commenced construction in 2014 with a total area of 303.8 hectares.  Currently, Que Vo III is now under 2nd phase of development and synchronized infrastructure system that equipped internal road system, IT facilities, water pump station, power station and  water treatment plant.

Location map

Que Vo III Industrial Park located in Viet Hung commune, Que Vo District, Bac Ninh Province (Bordering Hanoi area) with convenient transportation to link with Hanoi, Bac Giang, Quang Ninh, Hai Phong, Noi Bai International Airport…. which creates the very convenient hub for enterprises in manufacturing, importing, exporting and transporting goods and materials.

– Distance to Hanoi city center: 45 km

– Distance to Noi Bai International Airport: 40 km

– Distance to Hai Phong port: 80 km

– Distance to Cai Lan – Quang Ninh deep seaport: 105 km

– Distance to China border checkpoint: 120 km

Technical infrastructure:

1. Land condition:

– The land is filled up with sand, compaction: K>=0.9

– Ground sea level: 2.3 m

2. Road system: The road is spread asphalt with heavy loading to ensure favorable transportation to each land lot

– Main road: 40m.

– Branch road: 22.5m

3. Synchronized power supply system: Sufficient and stable with total capacity of 120 MW

4. Water supply system: Stable water supply system (provided by 2 water factories) connected to the rented land with total capacity of 20,000 m3/day

5. Wastewater treatment plant: Wastewater treatment plant with capacity in Phase 1: 2,500 m3/day has been invested and operated.

6. IT facilities: Modern IT system with wide range of services. Services provided by Viettel, VNPT.

7. Social infrastructures: worker dormitory support projects

8. Security in the industrial zone: Que Vo III has established a police station near the IP to ensure order and security. Professional security forces have the responsibility to maintain security and order in the IP, ensure the security and safety of the factories in the IP and protect the employees, and well manage and protect foreign employees working and residing in the area. These advantages creates a favorable environment to attract investment and create favorable conditions for enterprises in the industrial zone to develop their business operation.

9. Fire protection: The water supply network for firefighting is designed in conjunction with the potable water supply network, which is located along the roads. The distance among fire hydrants is 120 m -150 m with a diameter of D125 mm.

10. Landscape: Green trees are planted and taken care of in accordance with approved planning to ensure green – fresh – beautiful industrial zone.

QUE VO III INDUSTRIAL PARK – MASTER PLAN

INFORMATION OF BAC NINH PROVINCE

Facts and Figures:

  • Capital: Bac Ninh City
  • Area: 822.7 km2
  • Population: 1,131,200 people
  • Labor forces: 60% of population in working age

LOCATION

LOCATION

Description

Multi-functional industrial park support electronics assembling, precision technology; food processing

Distance to major cities

Hanoi City: 40 km in 1 hour

Nearest Seaport

Hai Phong sea port: 80 km in 1.30 hours

Nearest Airport

Noi Bai International Airport: 45 km in 50 minutes

Nearest railway station

NA

AREA

AREA

Planning area

303.8 hectares

Area available for rent

110 hectares

Zoning map

https://www.google.com/maps/dir/20.6577123,105.9271289/21.1475164,106.1701342/@21.150136,106.1729429,2914m/data=!3m1!1e3

INFRASTRUCTURE

INFRASTRUCTURE

Roads

Main road 60 m, 36 m and branch road 22 m in width

Electrical

One newly equipped transformer 110kV – capacity of 2 x 63 MV

Water

16,000 m3/day

Contact Info

sale@tniholdings.vn

Garbage disposal

By 3rd party vendor nearby the IP

Wastewater

5,800 m3/day (Phase 1); 5,000 m3 (Phase 2)

Finance

Maritime Bank, Viettin bank

Training School

N/A

Housing for workers

Worker Dormitory project available and demanding from tenants

Other gadgets

NA

COST

COST

Rents do not have the infrastructure

Free until 2024

The rental facilities

call Sale. TNI Holdings Vietnam

Electricity prices

EVN Que Vo

water Rates

from 13.400 VND/m2 (excluded VAT)

Labor costs

Zone 2 - 250 USD ++

Solid waste disposal fee

NA

Wastewater treatment fee

Level A: from 0.15 USD/m3; Level B: from 0.45 USD/m3... (VAT excluded)

Management fee

0.35 USD/m2/year

Other expenses


CURRENT STATUS

CURRENT STATUS

In operational

from 2016

Fill rate

10%

The enterprises in the IZ

7 investor from Korean, China and Taiwan

Investment Incentives

support from TNI Holdings

SWOT

SWOT

Strengths

Reasonable cost on investment; strategic location; wide range of choice for investors

Weaknesses

Still under of development

Opportunities

Limited supply for short-term thus creating opportunity to attract more clients

Challenge

Limited labor force and increasing salary create further hardship for Bac Ninh and IPs